Ardus: Powered Data Center Capacity from 1 MW to 10 MW
Get your compute live in weeks. Map your requirements, 1 MW to 10 MW. Ardus agents find existing powered data center capacity that fits, verify it, and set your go-live date. You bring the GPUs.
How it works
- Requirements. MW, density, region, and go-live date.
- Path. The fastest existing site for your load.
- Move in. Terms, access, fiber, fit-out.
- Live. Racks live on the date we give you.
Agents do the legwork.
They search sites, confirm spare power and cooling, check fiber and access, pull quotes and lead times, and model your schedule.
Existing capacity, matched to you.
Tell us the MW, region, and go-live date. Agents find powered capacity that already exists, verify it, and set the date. You bring the GPUs.
- Modeling. Your requirements in. Site, go-live date, and critical path out.
- Sites. Existing sites with power and cooling available now, scored by months to first MW.
- Power. Contracted MW, substation capacity, and redundancy, checked per site.
- Cooling and density. Air, rear-door, or direct-to-chip liquid, matched to your kW per rack.
- Fiber and access. Two diverse carriers where required, plus access, security, and remote-hands terms.
- Terms. Capacity, term, and monthly pricing for the MW you need.
Map your requirements.
From 1 MW to 10 MW. Map requirements and book a 30-minute call, or email hello@ardus.ai.